ORE Catapult
Risk Assessment Workbook
Your guide to safe and healthy workplace practices
Submitting, please wait...
Risk Scoring Information
Hazard Severity
| Descriptor | Consequence |
|---|---|
| Negligible | No injury or adverse outcome. No complaint, or customer dissatisfaction. Financial loss/business interruption < £1000. No damage. |
| Minor | Medical treatment required onsite only. Customer dissatisfied. Financial loss/business interruption: £1000 < Loss < £5000. Minor damage. |
| Moderate | Medical treatment required at hospital, or Reportable under RIDDOR as an >7 day injury. Reportable to EA as a spillage to sewer or surface water drains, or a release to atmosphere involving materials which do not carry R50-59 risk phrases. Customer complaint. Medium financial loss/business interruption: £5000 < Loss < £10000. Modest damage. |
| Major | Reportable under RIDDOR as a major injury or disease, or dangerous occurrence. Reportable to EA as a spillage to sewer or surface water drains, or a release to atmosphere involving materials which do carry R50-59 risk phrases. Likely case for litigation. Significant damage. High financial loss: £10000 < Loss < £50000. |
| Catastrophic | Fatality. Expected case for litigation. Major damage. Very high financial loss: £50000 < Loss. |
Probability of Occurrence
| Descriptor | Probability |
|---|---|
| Rare | This may occur, but only under exceptional circumstances, e.g. 1 in 25 years. |
| Unlikely | There is a slight chance of this happening, e.g. 1 in 5 years. |
| Possible | It is quite possible that this will happen at some time, e.g. 1 in every year. |
| Likely | This will happen at some time, e.g. every 2/3 months. |
| Almost certain | This will happen. It is a persistent issue, e.g. daily, weekly. |
Action & Timescales
| Risk Level | Action & Timescales |
|---|---|
| Trivial | No further action required |
| Low | No additional controls are required. Consideration should be given to a more cost-effective solution. |
| Medium | Efforts should be made to reduce the risk, but the costs of prevention should be carefully measured and limited. Risk reduction measures should be introduced in a finite time period. |
| High | Work must not be started or continued until the level of risk has been reduced, at least in the short-term, to at least a medium rating. If permanent measures are not introduced prior to the resumption or start of work they must be implemented at the earliest opportunity. |
| Very High | Work must not be started or continued until the level of risk has been reduced via permanent measures to at least a medium rating. |